Project Gallery
Real masonry work across Chicago's North Shore and Lake County. Before and after photos, detailed case studies, and the techniques behind every restoration.
Browse Our Completed Projects
Masonry Repair - 1955 Concrete and Brick Retaining Wall
14-foot center section rebuilt, French drain installed, full wall repointed
1955 concrete and brick retaining wall
View Case StudyMasonry Repair - 1960 Brick Front Stairs and Stoop Rebuild
4-step stair run and 6x8 foot stoop, full rebuild on reinforced concrete base
1960 brick front stairs and stoop rebuild
View Case StudyFull Facade Tuckpointing - 1978 Brick Colonial, Strathmore
195 linear feet of mortar joint restoration on a 1978 brick Colonial in the Strathmore subdivision of Buffalo Grove. Full four-elevation tuckpointing with Type N mortar following a real estate referral. Joint removal to 3/4 inch depth, two-lift packing, concave tooling. Repair summary provided for prospective buyer disclosure.
1978 brick subdivision Colonial
View Case Study
Before
After Multi-Generational Limestone Facade Renewal - 1916 Classical Estate
Complete repointing of 420 linear feet of Indiana limestone facade joints. Consolidant treatment of 11 spalled limestone panels. Profile repair of deteriorated column base moldings. Cleaning of biological growth from north elevation stone. Joint profile documentation for future generational maintenance.
1916 Indiana limestone classical facade
View Case Study
Before
After Limestone Facade Restoration - 1915 Indiana Limestone Estate, East Kenilworth
Indiana limestone facade restoration on a 1915 estate in East Kenilworth, referred by a real estate agent prior to listing. NHL 2 lime mortar specified to match the original low-strength natural hydraulic lime chemistry. 310 linear feet of joint restoration across the front and north elevations. Included cleaning of biological growth from limestone face units, consolidation of a partially delaminated limestone string course, and documentation of the mortar specification for disclosure to buyers.
1915 Indiana limestone facade
View Case Study
Before
After Tuckpointing - 1965 Brick Ranch Routine Maintenance Escalation
Three facades, 185 linear feet, full repointing
1965 brick ranch
View Case StudyBrick Repair - 1958 Cape Cod, Brick Veneer Tie Failure
16-foot section of brick veneer, 12 courses, rebuilt with new tie system
1958 Cape Cod with brick veneer
View Case StudyPrefab Firebox Chimney Repoint and Crown Rebuild - 1972 Two-Story, Northwest Palatine
Full repointing of all four faces on a two-story exterior chimney serving a prefabricated firebox on a 1972 two-story in Northwest Palatine. Crown demolition and rebuild with fiber-reinforced concrete. New stainless steel cap over steel liner. Type N mortar throughout. Inspection documentation provided.
1972 two-story chimney with prefabricated firebox
View Case Study
Before
After Full Chimney Crown Rebuild - 1975 Colonial
Crown rebuild, full repointing, new flashing
1975 Colonial
View Case Study
Before
After Chimney Tuckpointing - 1960s Ranch Home
Full chimney repointing, 4 faces
1962 Ranch
View Case StudyTuckpointing - 1949 Brick Bungalow with Face Brick Veneer
Full facade repointing, veneer tie course inspection, 200 linear feet
1949 brick bungalow with face brick veneer
View Case Study
Before
After Shared Firebox Chimney Repointing - 1955 Brick Chimney
Full repointing of all stack joints above roofline on double-flue 1955 chimney. Crown reseal. Step and counter-flashing inspection. Flue liner inspection from cleanout access.
1955 brick chimney with shared firebox
View Case Study
Before
After Full Facade Tuckpointing - 1938 Georgian Colonial
280 linear feet, full facade
1938 Georgian Colonial
View Case Study
Before
After Brick Tie Failure and Bulging Wall Repair - 2003 Brick Estate
Removal and reset of bulging veneer section on garage front elevation. Corroded tie replacement with stainless helical ties. Full repointing of reset section and adjacent courses. Weep hole clearing on full front elevation.
2003 brick estate home
View Case StudyBrick Repair - 1992 Brick Estate Colonial
8 brick replacements at sill course, surrounding mortar repair
1992 brick estate Colonial
View Case StudyTwo-Story Chimney Repair - 1948 Brick Mass Stack
Full repoint from roofline to crown, double-flue mass stack, new concrete crown
1948 two-story chimney mass
View Case StudyTuckpointing - 1952 Brick Bungalow with Limestone Sill Course
Full facade, 4 elevations, limestone sill course repointed
1952 brick bungalow with limestone sill course
View Case Study
Before
After Chimney and Parapet Tuckpointing - 1952 Three-Flat
Chimney + parapet walls, 3 stories
1952 Three-Flat
View Case StudyMasonry Repair - 1962 Lintel Rust and Foundation Parging
2 lintels repaired, 48 linear feet of foundation parging restored
1962 lintel and foundation parging
View Case StudyFull Repoint - 1942 Brick Bungalow with Limestone Sills
Full repoint, four elevations, limestone sill reset on three windows
1942 brick bungalow
View Case StudyTuckpointing - 1979 Brick Subdivision Colonial
Front facade and both gable ends, 210 linear feet
1979 brick subdivision Colonial
View Case Study
Before
After Full Facade Tuckpointing - 1928 Chicago Bungalow
Full four-elevation tuckpointing on 1928 Chicago bungalow. Approximately 260 linear feet of joints. Window sill joints, soldier courses, and porch pier joints included.
1928 Chicago bungalow with face brick
View Case Study
Before
After Insurance Claim Chimney Restoration - 1922 Tudor Revival Stack
Partial chimney stack rebuild above roofline following wind and debris damage. Replacement of decorative terra cotta chimney pot. Repointing of remaining stack courses. Corbel course repair at roofline transition. Scope and documentation prepared for insurance carrier adjuster review.
1922 Tudor Revival chimney stack
View Case StudyFull Facade Tuckpointing - 1992 Brick Subdivision Colonial
240 linear feet, all four facades, weep hole restoration
1992 brick subdivision Colonial
View Case Study
Before
After Chimney Stack Rebuild - 1996 Brick Veneer Two-Story
Crown demolition and replacement. Full repointing of stack joints above roofline. Flashing inspection and reseal. Brick veneer tie inspection at chimney base.
1996 two-story with brick veneer chimney
View Case Study
Before
After Brick Repair - 1958 Cape Cod Recent Purchase Assessment
Full facade assessment, 22 replacement brick units, mortar repointing on front and north facades
1958 postwar brick Cape Cod
View Case StudyFull Facade Tuckpointing - 1962 Brick Ranch on Wooded Lot
Three elevations, north and west faces heavy, approximately 195 linear feet
1962 brick ranch
View Case StudyTuckpointing - 1928 Brick Bungalow with Limestone Trim
Front and north facade, limestone surround joints, 175 linear feet
1928 brick bungalow with limestone trim
View Case StudyBrick Repair - 1995 Brick Subdivision Home
38 spalled brick units replaced, 60 linear feet mortar joint repair
1995 brick subdivision
View Case StudyChimney Partial Rebuild - 1958 Brick Residential
Upper flue section rebuild, 14 courses of brick
1958 brick chimney
View Case StudyFull Facade Tuckpointing - 1939 Brick Bungalow
Front and side facades, 190 linear feet
1939 brick bungalow
View Case Study
Before
After Historic Masonry Restoration - 1932 French Eclectic, East Glencoe Lakefront
Full facade historic masonry restoration on a 1932 French Eclectic estate in East Glencoe's lakefront corridor. NHL 3.5 natural hydraulic lime mortar specified based on core analysis of original mortar samples. New owners commissioned work within 90 days of purchase after a pre-closing inspection had flagged masonry as a priority repair. 290 linear feet across three elevations. Included removal of two incompatible prior patch zones, stabilization of a quoin block at the southwest corner, and restoration of the original recessed V-joint profile characteristic of French Eclectic construction in this era.
1932 French Eclectic
View Case StudyTuckpointing - 1956 Brick Ranch with Shared Firewall
3 elevations plus shared firewall, 310 linear feet total
1956 brick ranch with shared firewall
View Case Study
Before
After Garage Wall Brick Replacement - Northbrook
30 bricks replaced, surrounding joints repointed
1965 Detached Garage
View Case Study
Before
After Crown Failure and Stack Repointing - 1964 Brick Chimney
Crown demolition and replacement with fiber-reinforced sloped pour. Full repointing of all stack joints above roofline. Flue liner inspection. Flashing reseal at step and counter-flashing.
1964 brick chimney with crown failure
View Case StudyConcrete Driveway Replacement - 1998 Residential
Full driveway replacement, 720 sq ft, two-car wide, fiber and rebar reinforced
1998 driveway replacement
View Case Study
Before
After East Elevation Spalling Repair - 1932 Brick Bungalow
22 spalled brick units removed and replaced on east elevation. Full repointing of east elevation including soldier course. Salvaged brick matched from period inventory.
1932 brick bungalow with spalling on east elevation
View Case Study
Before
After Historic Lime Mortar Restoration - 1925 Tudor Revival
Front facade, 220 linear feet, lime mortar restoration
1925 Tudor Revival
View Case StudyCommercial Masonry - 1985 Brick Retail Storefront
Full storefront facade repointing, EIFS-to-brick transition repair, 160 linear feet
1985 brick retail storefront with EIFS adjacent
View Case StudyTuckpointing - 1959 Brick Ranch, Rosemont Residential
Full facade, 4 elevations, 340 linear feet
1959 brick ranch
View Case StudyChimney Repair - 1988 Prefabricated Chimney Enclosure
Full chimney repoint, concrete cap replacement, flashing inspection
1988 prefabricated chimney enclosure
View Case Study
Before
After Full Facade Tuckpointing - 1957 Brick Ranch
Full four-elevation tuckpointing. Approximately 240 linear feet of joints raked and repointed. Window sill joint inspection included.
1957 brick ranch
View Case StudyFull Facade Tuckpointing - 1968 Brick Ranch
Full facade, three elevations, approximately 220 linear feet
1968 brick ranch
View Case StudyFull Facade Tuckpointing - 1994 Brick Estate Home
310 linear feet, main house and detached garage, all facades
1994 brick estate home
View Case StudyDriveway Replacement with Control Joints - 1995 Concrete
Full removal and replacement, approximately 840 square feet, two-car width
1995 driveway replacement
View Case StudyBrick Repair - 1924 Brick Two-Flat
11 brick replacements, front facade mortar repair, lintel repointing
1924 brick two-flat
View Case Study
Before
After Full Facade Tuckpointing - 1948 Brick Bungalow
Full four-elevation tuckpointing on 1948 brick bungalow. Approximately 210 linear feet repointed. Soldier course joints and window sill joints included.
1948 brick bungalow
View Case StudyBrick Repair - 1938 Brick Two-Flat, Wrong Mortar Damage
19 spalled bricks replaced, surrounding joints repointed with Type O
1938 brick two-flat
View Case StudyBrick Repair - 1934 Tudor Revival
14 brick replacements, full front facade mortar repair
1934 Tudor Revival
View Case Study
Before
After Chimney Rebuild After Pre-Sale Inspection - 1939 Colonial Revival
Full chimney inspection following pre-sale report findings. Crown demolition and poured replacement. Repointing of 180 linear feet of stack and shoulder joints. Flashing reseat and seal at roofline.
1939 Colonial Revival chimney
View Case Study
Before
After Tuckpointing - 1923 Tudor Revival Cumulative Freeze-Thaw
Three facades, 340 linear feet, full repointing
1923 Tudor Revival
View Case Study
Before
After North and West Face Tuckpointing - 1964 Ranch
North and west facades, 165 linear feet
1964 Ranch
View Case StudyBrick Veneer Spalling Repair - 1956 Cape Cod
31 spalled veneer units replaced, wall tie inspection and replacement on upper gable field
1956 Cape Cod brick veneer
View Case StudyMasonry Repair - 1932 Commercial Parging and Foundation
180 sq ft parging replacement, foundation crack repair, two-coat system
1932 commercial parging and foundation
View Case Study
Before
After Brick Repair and Repointing - 1924 Georgian Colonial, Indian Hill Winnetka
Replacement of 38 spalled and fractured brick units on the north and northwest elevations of a 1924 Georgian Colonial estate in Indian Hill, Winnetka. Type N mortar used for all new setting beds and repointing work. Included full repointing of 140 linear feet of surrounding joint field where prior mortar work had accelerated spalling. New brick sourced from salvage stock matched to original Chicago common brick dimensions and color range.
1924 Georgian Colonial
View Case StudyFull Facade Tuckpointing After Foundation Settlement - 1955 Cape Cod
210 linear feet of mortar joint restoration on a 1955 brick Cape Cod in Central Arlington Heights. Repair of settlement-related joint cracking on the north elevation plus full facade tuckpointing with Type N mortar. All four elevations repointed to uniform condition. Concave joint profile retained.
1955 Cape Cod
View Case StudyBrick Repair - 2001 Brick Estate-Style Home
14 brick units replaced, expansion joint rebuild, 30 linear feet repoint
2001 brick estate-style home
View Case Study
Before
After Front Walkway and Entry Steps Replacement - 2010 Concrete
Demolition and removal of existing walkway slabs and entry steps. Sub-base regrade and compaction. Pour of new 4,000 PSI air-entrained walkway in three sections with placed control joints. Formed and poured new entry steps with broom finish.
2010 concrete walkway and steps replacement
View Case StudyRetaining Wall and Garden Steps Repair - 1985 Brick
34 linear feet retaining wall repair, 7-step garden stair repoint and cap reset
1985 retaining wall and garden steps
View Case StudyChimney Repair - 1954 Brick Chimney Mass
Full chimney repointing above roofline, crown replacement
1954 brick chimney mass
View Case Study
Before
After Spalled Brick Replacement - 1940s Chicago Bungalow
12 spalled bricks replaced, mortar joints repointed
1940s Chicago Bungalow
View Case StudyFull Facade Tuckpointing - 1916 Brick Foursquare
320 linear feet, all four facades
1916 brick Foursquare
View Case Study
Before
After Spalled Brick Replacement - 1986 Brick Colonial
37 spalled brick units removed and replaced on west and north elevations. Full repointing of affected courses. Mortar color match to original 1986 factory joint.
1986 brick subdivision Colonial
View Case StudyFace Brick Repair - 1962 Brick Split-Level
23 face brick units replaced, lower course and window surround
1962 brick split-level
View Case StudyBrick Repair - 1961 Brick Ranch, Face Brick Spalling
24 face bricks replaced, adjacent joints repointed with Type N
1961 brick ranch with face brick spalling
View Case StudyChimney Repair - 1958 Brick Chimney with Corbeled Cap
Full chimney repointing above roofline, corbel course repair, crown replacement
1958 brick chimney with corbeled cap
View Case StudyFront Stoop and Porch Rebuild - 1972 Brick
Full stoop and porch rebuild, new footing, approximately 180 brick units
1972 brick front stoop and porch
View Case StudyBrick Repair - 1961 Brick Ranch with Face Brick Veneer
22 brick units replaced, lintel rust treatment, 45 linear feet repoint
1961 brick ranch with face brick veneer
View Case Study
Before
After Chimney Repair - 1972 Mission Hills Crown Failure and Rebuild
Crown demolition and rebuild, 6 replacement brick units, upper stack repointing, flue tile inspection
1972 chimney with prefabricated crown failure
View Case StudyBrick Repair - 1947 Brick Bungalow, Face Brick Replacement
17 face bricks replaced, full front facade joints repointed
1947 brick bungalow with face brick replacement
View Case StudyMulti-Generation Tuckpointing Catch-Up - 1958 Brick Split-Level, Central Palatine
240 linear feet of mortar joint restoration on a 1958 brick split-level in Central Palatine. Full four-elevation tuckpointing with Type N mortar following nearly two decades of deferred maintenance after a family ownership transfer. Included removal of DIY patch material on the lower front elevation and restoration of original joint profile.
1958 brick split-level
View Case Study
Before
After Retaining Wall Rebuild - Highland Park Residential
32 feet retaining wall, full rebuild with drainage
1960s residential
View Case StudyBrick Repair - 1989 Brick Subdivision Colonial
17 brick units replaced, step flashing rebuild at roof-to-wall junction, 35 linear feet repoint
1989 brick subdivision Colonial
View Case Study
Before
After Lintel Failure and Facade Stabilization - 1925 Mixed-Use Storefront
Replacement of two failed steel lintels above storefront display windows. Repointing of 340 linear feet of facade joints from grade to parapet. Repair of stepped cracking pattern at lintel zones. Reset of displaced brick above window openings. Parapet cap inspection and repointing.
1925 mixed-use commercial facade
View Case Study
Before
After Historic Masonry Restoration - 1898 Late Victorian, East Wilmette
Full facade historic masonry restoration on an 1898 Late Victorian in East Wilmette using a Rosendale-style natural lime mortar blend. Work originated from a five-year inspection that revealed mortar recession progressing faster than the previous inspection cycle had indicated. Included mortar core extraction and mix analysis, full repointing of three elevations at an average recession depth of 1-1/8 inch, consolidation of face-spalled brick at the bay window surround, and restoration of the original flush-cut joint profile consistent with Victorian-era construction.
1898 Late Victorian
View Case Study
Before
After Driveway Replacement - Arlington Heights
680 sq ft driveway, full tear-out and replacement
1978 Split-Level
View Case Study
Before
After Brick Repair - 1968 Brick Colonial Pre-Sale
Front and side facades, 34 replacement brick units, mortar joint repointing
1968 brick Colonial
View Case Study
Before
After Routine Maintenance Escalation - 1926 Tudor Cottage
Full tuckpointing of all four facades following escalation from routine inspection. 210 linear feet of joint raking and repointing. Repair of open joints at half-timbered panel boundaries. Sill-to-brick transition repointing at all first-floor windows. Mortar probe testing at 24 locations prior to scope finalization.
1926 Tudor cottage
View Case Study
Before
After Tuckpointing - 1924 Chicago Bungalow Prior Contractor Failure
Full front facade and south return, 210 linear feet, removal of prior Portland patches
1924 Chicago bungalow
View Case Study
Before
After Full Facade Tuckpointing - 1908 Limestone-Faced Estate, East Kenilworth
340 linear feet of mortar joint restoration on a 1908 limestone-faced estate along the East Kenilworth Sheridan Road corridor. Natural hydraulic lime mortar NHL 3.5 specified to match the original low-calcium lime chemistry. Work included full removal of 1970s-era Portland-based repointing on the south and east elevations, cleaning of carbonation bloom from limestone face units, and restoration of the original square-cut joint profile.
1908 Limestone-faced estate
View Case StudySpalled Brick Replacement After Failed Repoint - 1974 Brick Colonial, West Deerfield
Removal and replacement of 19 spalled brick units on the west elevation of a 1974 brick Colonial in West Deerfield. Sourcing of period-matched brick, Type N mortar repointing of all affected joints on the west face, and correction of previously applied incompatible Type S mortar across the same elevation.
1974 brick Colonial
View Case Study
Before
After Prior Contractor Mortar Failure - 1908 Prairie School Roman Brick
Removal of approximately 200 linear feet of failed Type S patch mortar applied by a prior contractor. Repointing with NHL 3.5 natural hydraulic lime mortar matched to original joint profile. Repair of 14 spalled Roman brick faces using lime-putty consolidant and tinted repair mortar. Rake-and-repoint of deteriorated joints on full north and west elevations.
1908 Prairie School with Roman brick
View Case Study
Before
After Limestone Restoration - 1962 Split-Level Water Table Repair
18 linear feet limestone water table reset and repointed, spalled limestone cap replaced
1962 split-level with limestone water table
View Case StudyChimney Crown Rebuild and Repointing - 1961 Ranch
Full chimney crown demolition and rebuild, repointing of all four chimney faces to 3/4 inch depth, new step flashing, and stainless steel chimney cap installation on a 1961 brick ranch in Central Glenview.
1961 ranch chimney
View Case Study
Before
After Chimney Rebuild and Repointing - 1935 Tudor Revival, Hubbard Woods Winnetka
Partial chimney mass rebuild above roofline on a 1935 Tudor Revival in Hubbard Woods, Winnetka. Included replacement of failed steel lintel at the firebox opening, reconstruction of the chimney crown with integral drip edge, and full repointing of remaining below-roofline chimney courses in Type N mortar. The chimney stack had experienced progressive water intrusion leading to interior plaster damage on two floors. Work required scaffolding for the full chimney height.
1935 Tudor Revival chimney mass
View Case StudyBrick Lintel Repair and Spall Replacement - 1985 Estate Home, Inverness Border
Steel lintel replacement over rear bay window, removal and resetting of 8 spalled brick units above the lintel, and repointing of affected mortar joints on the rear elevation of a 1985 brick estate home near the Inverness border in Palatine. Type N mortar throughout.
1985 brick estate home
View Case Study
Before
After Freeze-Thaw Chimney Mass Stabilization - 1894 Late Victorian
Full repointing of a three-flue chimney mass spanning two-and-a-half stories. Replacement of failed chimney cap. Repair of displaced brick at two corbel courses. Flue liner inspection and mortar wash repair at crown interface. Documentation of mortar profile and formula for Historic District compliance file.
1894 Late Victorian chimney mass
View Case Study
Before
After Historic Masonry Restoration - 1912 Colonial Revival, Central Winnetka
Full facade historic masonry restoration on a 1912 Colonial Revival in Central Winnetka. NHL 3.5 natural hydraulic lime mortar specified to replicate original pre-Portland-era lime chemistry. Work included mortar analysis of extracted core samples, selective brick consolidation on the east gable end, restoration of the original Flemish bond coursing pattern, and rebuilding of the front portico pilaster bases where cumulative freeze-thaw damage had progressed over four decades of deferred maintenance.
1912 Colonial Revival
View Case Study
Before
After Brick Repair - 1964 Brick Ranch Multi-Gen Home Update
Front and garage facades, 48 replacement brick units, header course repointing, lintel cleaning
1964 brick ranch with face brick veneer
View Case Study
Before
After New Owner Fieldstone Wall and Pillar Repair - 1958 Knollwood Estate
Repointing of 160 linear feet of fieldstone garden wall. Structural repair of two entry pillars with displaced cap stones. Mortar joint repair at pillar-to-wall transitions. Drainage channel clearing at wall base. Inspection and documentation of wall structural condition for new owner records.
1958 fieldstone garden wall and entry pillars
View Case Study
Before
After Historic Restoration - 1911 Arts and Crafts Clinker Brick
Structural crack remediation, full facade repointing, 12 clinker brick replacements
1911 Arts and Crafts with clinker brick
View Case StudySpalled Brick Replacement - 1962 Brick Ranch, Northwest Arlington Heights
Replacement of 11 spalled and impact-damaged brick units on the west and south elevations of a 1962 brick ranch in Northwest Arlington Heights. Period-matched brick sourced, set in Type N mortar. Repointing of all surrounding joints on affected elevations. Repair documentation prepared for insurance file.
1962 brick ranch
View Case Study
Before
After Chimney Repointing and Crown Repair - 1929 Tudor Cottage, Kenilworth Gardens Wilmette
Chimney repointing and full crown replacement on a 1929 Tudor cottage chimney in Kenilworth Gardens, Wilmette. Work originated as an insurance claim follow-up after a hail and wind event. Type N lime-blend mortar used throughout. Included documentation of pre-existing versus storm-accelerated damage for insurer review, replacement of cracked chimney cap, and repointing of the upper six courses above roofline where hail impact had fractured mortar faces.
1929 Tudor cottage chimney
View Case Study
Before
After Full Facade Tuckpointing - 1925 Bungalow, East Wilmette
190 linear feet of mortar joint restoration across the full facade of a 1925 Chicago common brick bungalow. All four elevations tuckpointed with lime-rich Type O mortar matched to the original low-strength specification. Included removal of incompatible modern patch material on the east elevation and restoration of the original concave joint profile.
1925 Bungalow
View Case Study
Before
After Post-Storm Limestone Spandrel Repair - 1928 Tudor Lakefront
Assessment and repair of hail-accelerated limestone spalling on three spandrel panels above first-floor windows. Repointing of limestone trim joints at string course and entry surround. Consolidant application to two friable sill sections. Mortar joint repair at brick-to-limestone transition courses.
1928 limestone-trimmed Tudor
View Case StudyPost-Storm Tuckpointing - 1929 Chicago Bungalow, East Deerfield
165 linear feet of mortar joint restoration across all four elevations of a 1929 Chicago common brick bungalow in East Deerfield. Post-storm assessment, removal of storm-loosened mortar and pre-existing recession, and full repointing with lime-rich Type O mortar. Included concave joint retooling to original bungalow profile.
1929 Chicago bungalow
View Case Study
Before
After Chimney Repair - 1922 Tudor Corbeled Cap After Storm
Corbeled cap rebuild, upper stack repointing, flashing reset, 8 replacement brick units
1922 Tudor chimney with corbeled cap
View Case Study
Before
After Full Facade Tuckpointing - 1928 Tudor Revival, East Glencoe Lakefront
260 linear feet of mortar joint restoration on a 1928 Tudor Revival estate in East Glencoe's lakefront corridor. Type N lime-blend mortar specified for the combination of soft common brick and clinker brick detailing typical of this era. Work followed post-storm assessment of ice and wind damage across the north and west elevations. Included repair of three displaced soldier course bricks above the main entry arch, and full repointing of the chimney crown base where ice had opened the mortar cap joint.
1928 Tudor Revival
View Case StudyChimney Repointing and Cap Replacement - 1968 Two-Story, Central Deerfield
Full repointing of a two-story exterior chimney on a 1968 two-story brick home in Central Deerfield. All four chimney faces repointed with Type N mortar to 3/4 inch depth. Crown resurfaced with elastomeric coating after surface crack repair. New stainless steel cap with rain cover installed.
1968 two-story brick chimney
View Case Study
Before
After Pre-Listing Foundation Remediation - 1906 Shingle Style
Full perimeter repointing of an exposed brick foundation on a 1906 Shingle Style home. Repair of two sections of displaced foundation brick. Mortar wash repair at sill plate junctions. Written condition report for real estate transaction file.
1906 Shingle Style with brick foundation
View Case StudyHave a Project in Mind?
Free inspection and written estimate. No obligation.